Matix provided engineering services for the replacement of two 400kV 3 PH generating step-up transformers at a thermal power plant. Our work included a study of the existing equipment and foundations, coordination of new transformers and foundations, containment, and fire wall.
Seismic engineering for this equipment with a gross weight of over 250 tons was performed by our engineers to ensure adequate anchorage and integrity following a large earthquake event.
Professional engineers in each discipline have the expertise to solve complex problems to keep plants in continual operation.